A new glass crusher at the Pockwood Pond dumpsite is now tasked with diverting as much as one-fifth of Tortola’s waste stream. Located between the non-operational incinerator and the concrete …
February 2, 2024
A new glass crusher at the Pockwood Pond dumpsite is now tasked with diverting as much as one-fifth of Tortola’s waste stream. Located between the non-operational incinerator and the concrete …
Waste Management Director Marcus Solomon stood with his back to the non-operational incinerator December 14, watching a front-end loader scrape clean the dumpsite tipping area at Pockwood Pond. He crossed …