A new glass crusher at the Pockwood Pond dumpsite is now tasked with diverting as much as one-fifth of Tortola’s waste stream. Located between the non-operational incinerator and the concrete …
The new waste director’s trial by fire
Waste Management Director Marcus Solomon stood with his back to the non-operational incinerator December 14, watching a front-end loader scrape clean the dumpsite tipping area at Pockwood Pond. He crossed …
Incinerator gets parts, but others still needed
As waste crises plague the territory’s two most populated islands, government is working to complete long-delayed repairs to the Tortola incinerator and to bring Virgin Gorda a safer landfill, according …
Continue reading “Incinerator gets parts, but others still needed”
Incinerator repair date bumped again
After two fires at the Pockwood Pond dump last month sent thick smoke over West End and beyond, Health and Social Development Minister Marlon Penn said May 26 in the …
Pockwood Pond incinerator control panel installed
The new control panel for the nonfunctional Pockwood Pond incinerator has been installed by Consutech Systems LLC, and Skelton Electric Limited is completing the final electrical works, Health and Social …
Continue reading “Pockwood Pond incinerator control panel installed”
Incinerator part to be shipped next week
Repairs to the Pockwood Pond incinerator are “in progress,” and a needed part is set to ship next week, Health and Social Development Minister Carvin Malone said last Thursday in …